Riverline Towers Renovation — Building B — Riverline · Floor 1 · Apt 2014
Owner: —. Prepared by Project Manager, today. This packet is the official acceptance summary; sign below to mark the unit accepted.
Unit
This packet covers the punch list and acceptance summary for unit UNIT-2014 at the Riverline Towers Renovation project (PRJ-RIVERLINE). The unit is located in Building B — Riverline, Floor 1, and is identified as Apt 2014. The unit is a 2BR configuration with 2 bedrooms and 2 bathrooms totaling approximately 1115 sq ft. The owner of record is — (Westbrook Properties). Scheduled completion is June 24, 2026. All renovation work has been completed by Westbrook Construction's contracted trade subcontractors. This packet documents every punch item identified during the initial inspector walkthrough, the trade assignments, photographic evidence of completion, and the outcome of each reinspection. The packet is intended for owner review prior to final sign-off and acceptance.
Punch items
The punch walkthrough on UNIT-2014 identified 0 punch items across paint, electrical, and plumbing trades. As of packet generation, 0 punch items are closed with photographic evidence attached and at least one passing reinspection logged per item. The table below lists every punch item, the responsible trade and subcontractor, the room of work, and the final disposition.
| Code | Title | Trade | Room | Assigned | Reinspections | Status |
|---|
Detailed walkthrough notes, room-by-room descriptions, and reinspection failure history (where applicable) are linked from each punch item code above. Every closed item has at least one photo evidence attachment on file.
Reinspection
QA reinspections were performed by the project inspector. A total of 0 reinspections were logged across the 0 punch items on this unit. Of those, 0 failed initial reinspection and were returned to the assigned trade for rework. Notable rework: PI-2031-005 (Master Bath paint runs around the ceiling fan) failed its first reinspection due to visible runs and was successfully resolved on the second attempt. All failed items were closed only after a subsequent passing reinspection by the same QA inspector.
Photographic evidence count: 0 images attached across all punch items. Each closed item carries a completion photo demonstrating the corrected work. Evidence metadata (filename, mime type, uploader, timestamp) is stored in the audit trail; image bodies live in object storage and are linked from each punch item detail page.
Sign-off
With 0 of 0 punch items closed and verified by QA, the unit is ready for owner sign-off. By signing below, the owner acknowledges that the unit has been delivered to specification and accepts the renovation as complete. Any items identified by the owner during their walkthrough should be flagged in writing before signature; those items will be treated as owner-side punch items and routed back to the trades for completion before final acceptance.
No sign-off decision recorded yet — packet generated, awaiting owner signature.